Cover image for Plans and Drawings of the Mill, Machinery, Water Supply and Tramway at the Magnet Mine
Series:
Plans and Drawings of the Mill, Machinery, Water Supply and Tramway at the Magnet Mine
Series Number:
Access:
Open
Start Date:
08 Sep 1896
End Date:
31 Dec 1930
Source:
Tasmanian Archives
How to Use:
Plans were passed to Mineral Resources Tasmania in 1999 by a member of the public who found them in a building in Bathurst Street when it was being demolished. While MRT felt they had probably originated from the mine office they decided to retain all the underground mine plans for future use. The remainder were passed to Archives.
Series notes:
Plans for construction of facilities at Magnet Silver Mining Co. N. L. Includes plans of the mill, machinery, the mines' water supply, eletricity and tramway.

These records are part of the holdings of the Tasmanian Archives
Items:


Plan - A02.01 Mining truck - Capacity 7 1/2 cubic ft.
Plan - A02.02 Mining truck - Capacity 12 cubic ft. - 27
Plan - A02.03 Ore truck for 30 deg. inclined haulage line - Capacity 14 cubic ft. - 29
Plan - A02.04 Mine truck - 13
Plan - A02.06 Wheels and axles for mine trucks
Plan - A02.07 Wheels and axles for mine trucks
Plan - A02.08 Side-tipping truck - Capacity 12 cubic ft. - Hawke & Co Mining Engineers
Plan - A02.11 Mine truck wheel
Plan - A03.0 Parts of delivery valve for Cameron pump
Plan - A03.06 and A03.07 CI cylinder - A61.14 and A61.15
Plan - A04.02 Bucket for flying fox - Capacity 13 1/2 cubic ft. - A8
Plan - A04.03 Trestle for flying fox
Plan - A04.04 Spring catch for flying fox - A17
Plan - A04.05 Bin at adit no. 4 - A24
Plan - A04.06 Automatic clip release & Clip for rope haulage - B. H. Proprietary Comp. Ltd. - drawing no. 759
Plan - A04.07 Brakewheel frame - Main haulage - 5 (missing)
Plan - A05.0 Crossing at bins - A11.03
Plan - A05.01 Tram crossing 20" gauge - A11.04
Plan - A05.02 Tram crossing 20" gauge - A11.05
Plan - A06.0 Baby hoist - James Martin & Coy Ltd - Drawing no. 5472; Agents McMicking & Co; Printed by Paterson & Co
Plan - A07.00 Grizzly for drying plant - A7
Plan - A07.02 Grizzly for picking plant - A7.02
Plan - A07.04 Cam & shaft for Grizzly of drying shed - D23
Plan - A07.05 1/4" plate for shaker picking belt
Plan - A08.0 Screw jack - A34.01
Plan - A10.0 12' x 10' hut with quantities and costs
Plan - A10.01 Double 12' x 10' hut with quantities and costs
Plan - A10.02 Shed at no. 4 adit with quantities and costs - A25
Plan - A10.03 Ore shed - Plan of floor with quantities and costs - A26
Plan - A10.04 Carpenters shop
Plan - A10.05 Store - A26.02
Plan - A10.08 Fuel shed - D17
Plan - A11 Addition to upper ore bins - quantities
Plan - A11.02 Bin, for hand-picked mullock, to be added to crusher bin
Plan - A11.03 Roof over upper ore bins - A14
Plan - A11.04 Bin and tramway connection to mill - A5
Plan - A12.0 Rock crusher & grizzly - A12
Plan - A12.01 Jacques jaw crusher
Plan - A12.02 Crank shaft for crusher
Plan - A12.03 Toggle for Jacques crusher
Plan - A13.0 End tip tumbler - A2.10
Plan - A15 Cam shaft
Plan - A15.02 Gunmetal bearing for main shaft
Plan - A15.04 Detail of cam - full size - 22
Plan - A16.02 Pedestal bearing - A36.01
Plan - A18.01 Auxiliary steam plant - A58.01
Plan - A18.02 Arrangement of boiler foundation - A58.02 - Drawing 12797
Plan - A18.10 Arrangement of firebrick arch - NSW Govt Railways -Drawing 3909 - Shop order D800
Plan - A18.11 Brass blowoff cock for No. 2 boiler - A59.17
Plan - A18.15 Auxiliary steam plant - A58.0
Plan - A18.03 Engine - Drawing nos. 53021 & 25341 & 25342 - A58.03
Plan - A18.16 Gunmetal valve - D11.05
Plan - A18.17 Valves for air pump no. 2 engine condenser - D11.04
Plan - A19.00 A58.06
Plan - A19.01 Side elevation - A58.06
Plan - A19.03 End elevation - A58.08
Plan - A19.05 Auxiliary steam plant showing pipe taking water to the condenser
Plan - A19.06 Rope drive grooves - A59.20
Plan - A20.0 Detail of pipe sample for fine ore (missing)
Plan - A20.02 Arrangement of pipes for high level water scheme (missing)
Plan - A20.04 Skeleton of Pelton wheel with regulator for air-compressor - Drawing No. 9784 - Pfaff, Pinschof & Co
Plan - A20.05 Pelton wheel for driving concentrating mill - A20.05
Plan - A20.06 4' Pelton wheel - Drawing no. 53 M., D Richardson & Sons, Job no. 1310
Plan - A20.08 Deflector for 48" dia. Pelton
Plan - A20.09 Gunmetal spindle and nut for drier Pelton valve
Plan - A20.10 Gunmetal cylinder for drier Pelton valve
Plan - A21 Longitudinal section of pipe line - A19
Plan - A21.01 Horse for pipe line - A19.01
Plan - A21.02 Arrangement of pipes for high level water scheme - A20.02
Plan - A21.04 High-level water scheme; intake of pipe column - A20.04
Plan - A21.07 Spiral riveted pipe - A31.01
Plan - A21.08 Outfall of Magnet Dam - A31.02
Plan - A21.09 Pipes under dam at Magnet Creek - A31.03
Plan - A21.10 Spiral riveted pipe - A21.10
Plan - A21.11 Arrangement of screens at head of pipe line
Plan - A21.13 Best cast iron flexible joint mounting - A62.01
Plan - A22.01 Arthur River water race
Plan - A22.03 To enlarge fluming at Magnet Creek
Plan - A22.04 Elevation races and creeks from mill to Arthur Dam
Plan - A23.0 Proposed reservoir at Arthur River
Plan - A23.01 Temporary dam at Arthur River
Plan - A23.03 Arthur River reservoir
Plan - A23.06 and A23.07 Diagram shewing required storage - A39.05 and Diagram shewing required storage A39.04
Plan - A25.02 Proposed new crosshead pin for no. 1 engine - A53.2
Plan - A25.03 Boiler safety valve - D11.01
Plan - A25.06 Brass seat for 2 inch gate valve - A3.04
Plan - A28.00 Plan shewing general arrangement of drying plant - 33
Plan - A28.01 Longitudinal section shewing general arrangement of drying plant - 34A
Plan - A28.02 End plates for drying furnace - 7
Plan - A28.03 General type of bearing required for revolving furnace - 8
Plan - A28.04 Flue end brickwork of drying plant - 27
Plan - A28.045 Flue end brickwork of drying plant - 27A
Plan - A28.05 Drying plant - fire end of brickwork - 24A
Plan - A28.08 General arrangement of drier - 3
Plan - A28.10 Elevation of drying furnace building - 4C
Plan - A28.11 Iron work drying plant - 23
Plan - A28.12 Plan of buildings for drying plant - 5
Plan - A28.13 Details of elevator frame for storage bins - 12
Plan - A28.14 Shaking table for drying furnace feed - 36
Plan - A28.16 Cast iron ore conveyor for drying plant - 26
Plan - A28.17 Upper ore bin for drying plant - 15
Plan - A28.18 Alternative scheme for building in revolving drier - 4D
Plan - A28.19 Drying furnace - 6
Plan - A28.21 Cast iron brake wheel - 21
Plan - A28.22 Section through building - 4A
Plan - A28.23 No title
Plan - A28.24 Details of revolving furnace - 32
Plan - A28.25 No title (missing)
Plan - A28.26 Section of drying plant bagging shed
Plan - A28.28 Addition to shed over drying furnace
Plan - A28.29 Partition in drier feed bin shewing swinging shoot
Plan - A28.30 Methods of lining revolving drier
Plan - A28.40 Furnace for drying gossan samples
Plan - A29.02 Safety cage new design
Plan - A29.03 Chessel's safety cage No. 2
Plan - A29.04 Safety cage No. 1
Plan - A29.05 Broken Hill safety cage No. 3
Plan - A29.09 Brasses for mine cage
Plan - A29.10 Gripper for mine cage
Plan - A29.14 Skip for main shaft - A2.05
Plan - A29.15 Elliptical spring for mine cage
Plan - A30.00 Detail of pipe sampler for fine ore - 20
Plan - A33.0 Link belt
Plan - A33.02 Conveyor for dry ore
Plan - A35.00 Manager's residence
Plan - A35.01 Manager's residence - A35.01
Plan - A35.05 The cottage for Medical Officer for Magnet - PWD 1817
Plan - A36.01 Pedestal bearing
Plan - A37.00 Shaft head pulley - A38.01
Plan - A37.01 Shaft head pulley - A37.01
Plan - A38.01 Pinion for 10"x16" winch - A18.01
Plan - A38.025 Hardened cast steel Gudgeon pin
Plan - A38.05 Cast iron crank disc for No. 1 winch
Plan - A38.07 Outlines of a reversible Pelton wheel for mine hoist for the Pfaff Pinschoff Coy Ltd - Drawing No. 9764
Plan - A38.08 Brass bearing for winch
Plan - A38.09 Steam main boilers - winding engine
Plan - A38.10 Drum shaft sole plate for winding engine
Plan - A39.01 Record of rainfall and barometric pressure Jan 1 to June 30 1907
Plan - A41.08 Diagram from belt-driven air-compressor - A37.00
Plan - A42.01 Oil filter - A40.00
Plan - A42.01 Standard unions - Mt Morgan Gold Mining Co Ltd - M145
Plan - A42.03 Valves for rock drills, TGM Ltd Beaconsfield - G355
Plan - A43.00 Pooley's patent automatic coal scale: Capacity 2 cwt. - Gibson, Battle & Co - Db/61
Plan - A44.00 The premier rock drill - Hawke & Co - Drawing no. 1
Plan - A51.01 Riedler air compressor general drawing - Cameron & Sutherland, Melbourne, Fraser & Chalmers, Chicago
Plan - A51.03 16"x18" compressor motor driven - drawing no. 2658
Plan - A51.07 Proposed arrangement of belt driven 2 stage Gutermuth compressor, Fraser & Chalmers, Melbourne - A51.70
Plan - A51.09 Foundations and General arrangement - James Martin & Co Ltd, Phoenix Foundry, Gawler, SA, Drawing No. 5778
Plan - A51.10 General arrangement of proposed Pelton driven compressor air cylinder 14 1/2" dia. - A57.02
Plan - A57.01 Arrangement of two 8" plunger workings and one 6" drawlift workings - James Martin & Co Ltd, Phoenix Foundry, Gawler, SA, drawing no. 2653
Plan - A57.02 8 inch drawlift & plunger workings - James Martin & Co Ltd, Phoenix Foundry, Gawler, SA, drawing no. 102
Plan - A57.03 Cast iron Y piece to stand 197 lbs./sq. in pressure, flanges to be left plain
Plan - A57.04 Cast iron + piece to stand 197 lbs./sq. in pressure, flanges to be left plain
Plan - A57.05 Cast iron suction pipe
Plan - A57.06 Untitled
Plan - A57.07 Untitled
Plan - A57.08 Untitled - A61.05
Plan - A57.10 Cast iron bend for delivery of pump at no. 4 - A61.07
Plan - A57.12 Cast iron plunger for 16"x8"x18" steam pump - A61.09
Plan - A57.13 Cast iron pipes to connect no. 12 pump to column - A62
Plan - A57.16 Gland bush for 16"x7"x18" pump - A61.12
Plan - A57.17a Proposed arrangement of electrically drive three throw double acting pumps - Austral Otis Engineering Co Ltd, South Melbourne, plan no. 5069
Plan - A57.17b Electrically driven vertical triplex pump, drawing no. 5464
Plan - A57.17c Photo 295
Plan - A57.17d Photo 294
Plan - A57.17e Triplex ramp pump - sketch no. 329
Plan - A57.18 Cast iron pipes to connect no. 16 pumps to column
Plan - A57.19 General arrangement of a horizontal electrically driven three throw ramp pump - Messrs Crossley & Scott, Melbourne - Scheme no. 6552
Plan - A57.20 Foundation plan for 12 stage 4" centrifugal pump - 17265/817
Plan - A57.21 Layout of foundations - pumping chamber no. 16 level
Plan - A57.22 Arrangement of delivery piping - Geo W Kelly & Lewis P/L, Melbourne - 17505/817
Plan - A57.23 Arrangement of 3-4"-12 stage turbine pumps - Geo W Kelly & Lewis P/L, Melbourne - 16741/817
Plan - B1.00 Main shaft
Plan - B2.00 Opening set & chamber, no. 6 level, Quantities
Plan - B2.01 Foot-wall chamber no. 6 level
Plan - B2.02 Arrangements for pumping & winding below no. 6 level
Plan - B2.03 Arrangements for pumping & winding below no. 6 level
Plan - B2.04 No. 6 level, No. 6 level at intersection with main Xcut - B5
Plan - B3.0 Method of timbering - rises, for carrying passes, small main drives
Plan - B3.01 Level timber specification
Plan - B3.03 Square-set system of timbering
Plan - B3.04 Ore pass - timber required
Plan - B4.0 Magnet Silver Mining Company N/L
Plan - B4.02 Magnet Silver Mining Company N/L - Fire insurance plan showing approximate position of buildings
Plan - B4.10 Glass model of workings
Plan - B4.12 East Magnet showing relating between Magnet Creek & proposed position of Low Street - A56.0
Plan - B4.20 Plate 5 plan, Plate 6 section A-B, Magnet geology
Plan - B5.00 Magnet Silver Mine - Ore reserves - A7.99
Plan - B5.04 Magnet Silver Mine - Ore reserves - B4.23A
Plan - B5.05 Magnet Silver Mine - Ore reserves - B4.24
Plan - B5.06 Magnet Silver Mine - Ore reserves - B4.25
Plan - B5.07 Magnet Silver Mine - Ore reserves - B4.26
Plan - B5.08 Magnet Silver Mine - Ore reserves - B4.27
Plan - B5.10 Magnet Silver Mine - Ore reserves - B4.27
Plan - B5.11 Magnet Silver Mine - Ore reserves - B4.28
Plan - B5.12 Magnet Silver Mine - Ore reserves - B4.29
Plan - B5.15 Magnet Silver Mine - Ore reserves - B4.32
Plan - B5.18 Magnet Silver Mine - Ore reserves - B4.35
Plan - B5.12 Magnet Silver Mine - Ore reserves - B4.35 - annotated for 16/2/1924
Plan - B6.0 Iron door for mine shoots
Plan - B6.01 Shoot for ore bin
Plan - B6.02 Iron door for mine shoots
Plan - B7.0 Tailings scheme for filling stopes - B11.02
Plan - B8.0 Underground workings
Plan - B8.01 Underground workings
Plan - B8.04 Underground workings - B14.00
Plan - B8.05 Means of exit - B14.01
Plan - B10.0 Survey of underground - OL Adams, authorised surveyor
Plan - B10.01 Latitudes and departures of underground survey
Plan - B11.0 Arrangement of pump rods with details for curve in main shaft - Aurora West United G.M. Co. Ltd. - 770
Plan - B11.01 Ore bin & chutes, 6th level main shaft, Aurora West United GMC
Plan - B12.00 Notice - Any person except the platman, or man instructed by him . . .
Plan - B12.01 Notice - No person is to use the bucket engaged for sinking purposes . . .
Plan - B12.02 Notice - Keep away from self actor while trucks are in motion
Plan - B12.03 Notice - No men are to ride up or down the shaft except on an empty cage
Plan - B12.04 Notice - The store will be open at the following hours only: . . .
Plan - B12.05 Notice - Do not talk to the driver whilst engine is in motion.
Plan - B13.00 Crossings at no. 8 level - annotated
Plan - B13.01 No. 8 level - crossing to hanging wall
Plan - B15.00 Plan of new magazine
Plan - B15.01 Plan showing position of magazine with regard to Magnet Township
Plan - B15.02 Plan shewing magazine and main shaft
Plan - B16.00 Plan of underground workings - annotated
Plan - B16.01 Plan of underground workings - annotated
Plan - B17.00 Underground tool house - B13.02
Plan - B17.01 Underground tank no 5 level A1.00
Plan - B18.00 Crossing at no. 9 level - B13.03
Plan - B18.01 Untitled - B13.04
Plan - B19.00 Proposed arrangement of piping to fan
Plan - B19.01 Foot plates of chair
Plan - D01.00 Magnet Mill
Plan - D01.01 Extension of Magnet Mill - Round timber (missing)
Plan - D03.05 Cast iron elevator drum
Plan - D4.55 Iron disc for concentric screen - D4.73
Plan - D11.03 Proposed extension of concentrating mill - Details of shaker screens - D4.21
Plan - D11.04 Valves for air pump No. 2 engine condenser (missing)
Plan - D11.06 Arrangement of double eccentric for shake screens - Hawke & Co Mining Engineers, Kapunda, SA
Plan - D11.10 Shaker screen - D4.20
Plan - D13.01 Jig eccentric, Jig shaft, Stirrup feeder & bearings; Detail of socket hub for braces of slime tables
Plan - D13.011 Jig eccentric - Geo W Kelly & Lewis, Drawing 1207/23 - annotated
Plan - D13.03 Mine truck
Plan - D13.04 Luhrig jig
Plan - D13.05 Double plunger single compartment jig
Plan - D13.06 Plan of cast iron grating for no. 6 jig - D12.99
Plan - D13.07 General arrangement of double plunger jig
Plan - D13.08 Rough sketch of alternate designs for jig hutches - Hawke & Co
Plan - D13.10 Hand jig A4.00
Plan - D13.11 Hancock's patent jig - 16' sieve, drawing no. 84
Plan - D13.12 Arrangement & details of jigs, Drawing No. 1809 - James Martin & Co
Plan - D13.14 Improved compound jig, Drawing No. 79A - Hawke & Co
Plan - D15.00 Jig settling box
Plan - D15.01 Arrangement of 16 hopper slime settler - BHP Block 14 Co. Ltd
Plan - D16.0 Proposed conveying scheme from crusher to bin
Plan - D16.01 Proposed belt conveyor from crusher to mill bin
Plan - D19.00 Filter
Plan - D21.02 Arrangement of feed roll
Plan - D21.03 Gear for the Edwards ore feeder
Plan - D21.05 Side view of Challenge ore feeder shewing friction grip - N Guthridge
Plan - D21.06 Roll feeder drum - D20.08
Plan - D21.07 Untitled - annotated
Plan - D22.02 Pried. Krupp AG Grusonwerk - plan 137 - Noyes Bros.
Plan - D22.03 Coarse roll shell
Plan - D22.06 Angles inside roll shells - Jacques is the correct one
Plan - D22.07 Fine roll shell
Plan - D22.09 Plan of roll setting - D12
Plan - D22.10 Mill extension: Setting of rolls, roll feeder & shaker screen - D12.01
Plan - D22.12 Cheek plates for rolls - D16.06
Plan - D22.13 Collars for 20" rolls - D26
Plan - D22.14 30" x 15" rolls - D26.01
Plan - D22.15 Collars for 30" x 15" rolls - D26.02
Plan - D22.16 30" x 15" rolls - D26.04
Plan - D22.17 30" x 15" geared rolls, Drawing no. 5222 - The Sulphide Corp Central Mine B.H.
Plan - D22.18 Grinding machine for ore crushing rolls, drawing no. 8011 - James Archdale & Co Ltd
Plan - D22.21 Roll shaft
Plan - D23.02 Detail of (patented) conveyor idler for the Sulphide Corporation Ltd - Central Mine, drawing no. 5686
Plan - D23.07 Guide Troughing and return idlers for the belt - Drawing 5373 and 5377A & B
Plan - D24.00 Untitled - annotated
Plan - D24.01 Cast iron wedges for mill crusher, lower half
Plan - D24.04 Jaw plates for Marsden rock breaker
Plan - D24.05 Hard cast iron cheek plate for 16 x 9 Blake-Marsden crusher
Plan - D24.06 Cast iron block for 15" x 9" Blake-Marsden crusher
Plan - D24.07 Brass for Blake-Marsden crusher
Plan - D24.08 Cheek plate for crusher
Plan - D24.12 May's patent direct-acting rockbreaker - Specification
Plan - D24.14 10" x 16 1/2" rockbreaker - Drawing No. 84D
Plan - D25.00 Plan of grizzly - annotated
Plan - D26.01 The card concentrator foundation plan, Auxiliary erection plan, No. 3 - N Gutheridge Ltd
Plan - D26.02 The card concentrator foundation plan, No. 3 - N Gutheridge Ltd
Plan - D26.03 The card concentrator foundation plan, No. 2 - N Gutheridge Ltd
Plan - D27.0 Erection plan for Wilfley slime table, Plan No. 5759 - The Austral Otis Engineering Coy Ltd
Plan - D27.01 Wilfley slime table sketch - plan not to scale - shewing suggested alterations
Plan - D27.02 New steel frame & guides for Wilfley slime table
Plan - D27.03 Plan of improved Wilfley table top - D26.99
Plan - D27.06 The improved card concentrator erection plan - annotated - N Guthridge
Plan - D28 Chinese tables
Plan - D28.01 Plain surface canvas
Plan - D28.02 Chinese table
Plan - D28.04 The Phoenix Weir concentrating table, drawing no. 2957 - Phoenix Foundry
Plan - D28.05 Phoenix-Weir head motion - stroke diagram - D29.01
Plan - D29.00 Luhrig vanned, Drawing No. 2755 - annotated
Plan - D29.01 Sprocket wheel for Luhrig banners - D28.06
Plan - D29.02 Vanners parts mild steel spindle for under roller
Plan - D29.03 Vanners parts cast iron bearing for under roller (missing)
Plan - D29.05 Cast iron bearing for upper roller of Vanner
Plan - D29.06 Drawing No. 42 code word frustando, Drawing No. 120
Plan - D30.00 Distributer for table feed
Plan - D33.00 Ejector for fine tailings
Plan - E0.01 Layout plan shewing position of power house and lower pipe levels
Plan - E0.02 Hydro-electric plant for Magnet Silver Mining Co: Foundation plan of engine sets, Drawing no. 5
Plan - E0.03 General arrangement foundation plan of compressor and Pelton, drawing no. 4a
Plan - E0.04 Layout foundation plan of power house, drawing no. 4
Plan - E0.05 Power house building, drawing no. 6
Plan - E0.06 General arrangement of switchboard, drawing no. 8
Plan - E0.08 Insulator for power house
Plan - E0.09 Layout of pipe line, drawing no. 11
Plan - E0.10 General arrangement of balance tank at head works, drawing no. 12
Plan - E0.11 Layout of pipe line branches, drawing no. 13
Plan - E0.12 Drawing no. 14, superseding plan of branches in drawing no. 13, also shewing thrust blocks on pipe line
Plan - E0.13 General arrangement of trestle bridge for carrying pipe across Magnet Creek, drawing no. 7
Plan - E0.15 Shock valve parts turbo-generator pipe line
Plan - E2.00 No. 13 level pumps: Connections for 80HP
Plan - E3.0 Layout of pumps for no. 13 level, drawing no. 10
Plan - E3.01 Weymouth electric pumps motor bushes
Plan - E3.02 Weymouth electric pumps motor bushes coupling end
Plan - E3.03 General arrangement 10 stage turbine pump
Plan - E3.04 Assembly of first 5 stages of pumps nos. 156-157, drawing no. 1930
Plan - E3.05 Motor-driven pumping set, preliminary drawing no. 1906/26
Plan - E3.06 Bush for no. 1 pump - A61.13
Plan - E3.07 Weymouth electric pump - pump bush small end
Plan - E3.08 Weymouth electric pump - pump bush small end
Plan - E3.09 Gun metal retention valve spindle and combination nut and sleeve
Plan - E4.00 Arrangement 5 stage 2" turbine pump - 15079/393
Plan - E5.01 3" Pickering governor and strainer cylinder, drawing no. 1988
Plan - E5.02 Draft tube - A38.13
Plan - E5.03 Foundation plan of Gunther turbine & dynamo (Pelton wheel), dr. 1090
Plan - E5.04 Dynamo
Plan - E5.05 Connections for dynamo & circuit board T5474, sketch 0295
Plan - E5.06 Gooseneck and valve for dynamo Pelton - A21.01
Plan - E5.07 Spindle & nut for main valve turbo-generator
Plan - E5.08 Governor water turbine
Plan - E6.00 150 HP AC motor & gearing fitted to existing winding drums, drawing no. 1967 - A38.07
Plan - E6.01 150 HP AC motor & gearing
Plan - E6.02 Brush for winch motor - A38.12
Plan - E6.03 Steam port valve for winch
Plan - E6.04 Cheek plate for winding engine - fixed drum
Plan - E6.05 3" pitch spur wheel
Plan - E7.00 Brush holder for generator
Plan - E7.01 Shock valve parts turbo-generator pipe line
Plan - E7.03 Adaption of MV type brush holder to generator, drawing no. Z0504
Plan - E8.00 Sketch plan shewing approximate length of wiring & number of lamps - A21
Plan - E9.00 5 ton travelling crane, drawing no. 136/18 - A59.19 - annotated
Plan - E10.00 General & foundation plan, B-2462, A51.60
Plan - E10.01 8" dia. air inlet pipe - Ingersoll Rand compressor
Plan - E10.02 Foundation plan for 22 1/4"x14 1/4"x14" class 'J' with Pelton water wheel, drawing no. 26003
Plan - E10.03 Imperial intake and discharge unloader
Plan - E11.00 4 stage 2" turbine cent. pump 11419/393
Plan - E11.01 Arrangement of 4 stage 2" turbine pump 11731/393
Plan - E11.02 General arrangement of 150 HP motor and gearing, drawing no. 1917
Plan - E11.04 Arrangement of 3-4"-12 stage turbine pumps 16741/817
Plan - E11.05 Arrangement of 2-4"-12 stage turbine pumps 18470/817
Plan - E11.06 Arrangement of delivery piping 17505/817
Plan - E11.07 8 stage 4" motor driven turbine pump 11977/18
Plan - E11.30 Arrangement of motor - 175HP 3 phase 600 volts 50 cycles 1478 RPM, drawing 12821
Plan - E11.31 KL motor driven pump 15653/640
Plan - E11.32 Isometric view pump chamber
Plan - E11.33 5" gates valve - A20.11
Plan - E11.34 Valve motion universal gear connecting arm - C3.20
Plan - E11.35 Arrangement of SxA pillar DL3-25
Plan - E11.36 Diagram of connections of SxA type pillar
Plan - No. 2 dam cross section through dam showing proposed extension
Plan - Counter shaft - spur wheel
Plan - Pump and motors
Plan - General arrangement of pumping plant - 57.00
Plan - Foundation for Middleton Cobbe grinding pan, drawing no. 5518, Drawing no. 2 sheet no. 4