Series:
Train Control Diagrams
Series Number:
Access:
Open
Start Date:
09 Sep 1965
End Date:
31 Mar 1973
Creating Agency:
Transport Commission, Railway Branch (TA1736) | 01 Jul 1939 | 01 Mar 1978 |
An-Tasrail (XX8) | 01 Mar 1978 | 15 Nov 1997 |
Related Series:
P2076 Train Control Records for Single Line Working (including Staff and Ticket System) | 01 Jan 1901 | 01 Dec 1983 |
Series notes:
The train control diagrams used by the Tasmanian Railways are in chart form, based on a Victorian model. They were used by the Traffic Branch, later Operations Branch, to depict journey times on Tasmanian government railway lines and maintain control of all trains on Tasmania's single line rail network. The diagrams list stations and stops in order down the right and left hand side of the folio (eg. Hobart, Newtown, Moonah etc through to Launceston). Across the top of the folio are columns with entries for such information as: 'Train', 'Load', 'Stock', 'Empties', 'Wheat' and 'Drivers Name' etc. Beneath these columns runs a time chart divided into hourly blocks, which are divided again into 10 minute sub-columns. Graphs cover a period of 24 hours. They are the legal authority for the location and travel of all trains and are used in evidence at Boards of Inquiry in the event of collisions and accidents. In addition to charts for Tasmania there are also a small number of sample charts from the Victorian Railways.
These records are part of the holdings of the Tasmanian Archives
System of Arrangement:
Chronological; 9.9.1965 Main Line - 31.3.1973
Items: